Wednesday, 7 November 2012

Production Schedule


Production Schedule

 

 

Saturday 20th October

 

Location: Leyton Pavilion

Contacts: Filip (camera-man) 079******** Reema (director) 077********

Crew: Reema (director)

Filip (camera)

Yasmin (coordinator/ sound)

Actors (8 people)

Unit transport: Everyone meets up at the Leyton Sixth Form College, travelling by either bus or train

Directions: Arrive to a college by bus or train.  Meet at the entrance of the college until everyone arrives, then make ways to the venue together.

Equipment: Mini-DV cam, tripod, 2 batteries, charger, 2 mini DV cassettes

Props: The bride dress, groom suit, car

 

Call times: 11 am at Reema's house for getting costume and make up ready- For specific actors (Filip, Reema and Yasmin)
12 pm rest of the crew meets up at Leyton Sixth Form College
12.30 pm starts filming required scenes

 

Schedule:  12.30 - 13-30 Shoot shots 1-6
                   13- 13.40 Lunch
                   13.40 - 14.30 Shoot shots 7-9
                   14.40 Everyone goes home

 

 

 

Shooting Order:

Scene
Shot No / Storyboard ref.
Int / Ext
Time
Location
Characters
1-3
1-6
Ext / day
Bride House
Bride, Mum, make-up artist, boyfriend
4-6
7-9
Ext / day
Bride House
Bride, mum, boyfriend, groom

 

 

Saturday 27th October

 

 Location: Outside the wedding venue/ Hoe Street (scenes taking place on the street/ road)

Contacts: Filip (camera-man) 079******** Reema (director)

Crew: Reema (director)

Filip (camera)

Yasmin (coordinator/ sound)

Actors (8 people)

Unit transport: Everyone meets up at the meeting point, which is outside the venue, travelling by either bus or train

Directions:

Equipment: Mini-DV cam, tripod, 2 batteries, charger, 2 mini DV cassettes

Props: The bride dress, groom suit, car

 

Call times: 11.30 meet up at the entrance of the leyton pavilion.
12 pm rest of the crew meets up outside the venue
12.30 pm starts filming required scenes

 

 

Schedule:   12.30 - 13-30 Shoot shots 10-18
                   13- 13.40 Lunch
                   13.40 - 14.20 Shoot shots 19-21
                   14.30 everyone goes home

 

 

 

 

Shooting Order:

Scene
Shot No / Storyboard ref.
Int / Ext
Time
Location
Characters
 
10-18
Ext / day
Hoe Street
Boyfriend, bride, groom, friends.
 
19-21
Ext / day
Hoe Street
Boyfriend, bride, groom, friends, mum etc

 

 

 

 

Monday 22nd October

 

Location: Leyton Pavilion, wedding venue

Contacts: Filip (camera-man) 079******** Reema (director) 077********

Crew: Reema (director)

Filip (camera)

Yasmin (coordinator/ sound)

Actors (8 people)

Unit transport: Everyone meets up at the Leyton Pavilion, travelling by either bus or train

Directions: Arrive to Leyton Pavilion by bus or train.  Meet at the entrance of the weeding venue

Equipment: Mini-DV cam, tripod, 2 batteries, charger, 2 mini DV cassettes

Props: The bride dress, groom suit, car, pillow

 

Call times: 11 am at Leyton Pavilion for getting costume and make up ready (Filip, Reema and Yasmin)
12 pm rest of the crew meets up at the weeding venue
12.30 pm starts filming required scenes

 

 

Schedule:   12.30 - 13-20 Shoot shots 22-24
                   13. 30 Everyone goes home



 

 

 

 

Shooting Order:

Scene
Shot No / Storyboard ref.
Int / Ext
Time
Location
Characters
 
22-24
Ext / day
Grooms house
Bride, friends.

 

 

 

 

Rest of the days left for filming will be used as an extra time to go over each shoot and re-film any of the unwanted shots that needs changes, or to video some extra scene, just in case if something may be changed or added to the film.

 

To do this, we will use half-term and week after that as our left filming time. To do that we will have to go back to the places, where we shot all of our shoots.

 

 

 

 

 

 

Reema, Filip and Yasmin

No comments:

Post a Comment